Serving the Greater Pittsburgh Metro
    Warehouse Relocation system in an industrial warehouse

    Warehouse Relocation in Pittsburgh, PA

    Moving a Pittsburgh warehouse is more than getting steel onto a truck. The old building has to keep shipping while the new building becomes ready to receive, and the rack you already own may not fit the next column grid or clear height. River crossings, receiving restrictions, and the handover date all belong in the plan before the first beam comes down.

    Our warehouse relocation service starts with the inventory of your storage system and the measurements of the destination. We work through what can move, what needs replacement, and where new rack will close a capacity gap. You get a proposed layout and a phased scope before teardown starts, rather than trying to solve the new building while the steel is already in transit.

    (412) 866-1406

    How Warehouse Relocation Works

    1

    Inventory and layout

    Identify rack manufacturers, connection styles, quantities, damage, and capacity documentation. Measure the destination before deciding which components can be reused.

    2

    Teardown and labeling

    Unload the planned work zone, isolate it from active traffic, and label components by run or system as trained crews dismantle them.

    3

    Transport coordination

    Bundle components for handling and coordinate the carrier, receiving windows, unloading equipment, and destination staging areas with your team.

    4

    Reinstallation and handover

    Install to the approved destination layout, using the specified anchors and bracing. Provide configuration capacities and identify operating limits before loading.

    Pallet rack components and installed storage rows
    Warehouse rack layout with clear forklift aisles

    Where It Fits Best

    Businesses moving into a different warehouse
    A staged move while shipping continues
    Consolidating storage from several buildings
    Reusing documented rack components
    Adding new positions during a relocation

    What We Need to Design It

    • When must the old building be vacated?
    • Do you have rack drawings and capacity labels?
    • Which inventory must remain accessible during the move?
    • What are the destination’s clear height and column spacing?
    • Who is coordinating freight and unloading equipment?

    Why Pittsburgh Warehouses Work With Us

    Pittsburgh storage projects need to account for the actual building before comparing rack prices. Riverfront properties in the Strip District and Lawrenceville can have different receiving access from a suburban facility near I-79 or the Parkway East. We review your columns, usable height, forklift paths, and loading doors with the warehouse relocation specification, rather than assuming a drawing from another property will fit.

    As a division of Warehouse Equipment & Supplies Co., we begin with a Free Design Consultation and explain the tradeoff between access, storage capacity, and the way your inventory moves. You can review the proposed plan and ask about an alternative before committing to material. For warehouse relocation, that means discussing a documented destination layout before teardown alongside the constraints that your operators deal with each shift.

    The quote identifies the agreed material and work, and we coordinate delivery and installation questions with your receiving contact. Our team handles the permit side for you. A clear scope and a usable layout matter more than promising a catalog maximum that does not work on your floor.

    What a Project Includes

    Begin with photographs, the existing rack drawings if available, and the date you must surrender the old building. We record frame heights and depths, beam lengths, connection styles, decking, accessories, and visible damage. Reuse is a design decision: components need identifiable ratings and a configuration that works in the destination. Bent frames, damaged connectors, and undocumented parts are flagged before they are packed with reusable material.

    Next we measure the new building’s columns, clear height, doors, floor condition, and forklift paths. A CAD layout shows storage positions, staging, aisles, and the proposed relationship between picking and reserve inventory. The quote separates teardown, handling, transport coordination, installation, and any additional rack so you can see where the move budget goes. Our team handles the permit side for you.

    Once the layout and scope are approved, we sequence work with your operations team. You identify inventory that can move first and areas that must keep serving orders. Crews label and bundle steel, coordinate receiving at the destination, and reinstall to the agreed drawing. New anchors and any specified replacement parts are included in the installation plan. At handover, review capacity documentation, the finished layout, and remaining punch-list items before loading the rebuilt system.

    Before the Pittsburgh installation is scheduled, confirm the complete configuration against the manufacturer documentation. Review anchoring, bracing, load signage, and protection around lift truck travel. Your receiving team should know how material will be unloaded and where installation work is isolated from active operations. At handover, check the finished layout, capacity information, and operating instructions before storing inventory; later changes to beam or arm levels need another capacity review rather than a guess based on the original drawing.

    1

    Phone consultation

    2

    CAD layout

    3

    Itemized quote

    4

    Delivery & installation

    Warehouse Rack Systems

    Storage configurations for pallet handling, long material, and case picking.

    Rows of industrial pallet racks loaded with pallets in a Pittsburgh warehouse
    High-density pushback rack lanes loaded with pallets
    Carton flow rack with gravity wheel beds and case lanes
    Cantilever warehouse racking holding steel tubing
    Pallet flow rack lanes with gravity rollers installed
    Drive-in pallet rack lanes fitted with continuous rails

    Get a Warehouse Relocation Quote

    Send the basics and we will come back with a layout and pricing. Prefer to talk? Call (412) 866-1406.

    What's Included:

    • Free warehouse consultation
    • CAD layout drawings
    • Itemized project quote
    • Rack type recommendations
    • Installation timeline

    We respect your privacy. Your information will never be shared.

    Warehouse Relocation Questions We Hear Most

    Warehouse Relocation by Service Area

    Delivery and installation across Greater Pittsburgh and western Pennsylvania.

    Other Rack Systems We Supply

    Where We Work

    Located in Pittsburgh, we serve the entire Greater Pittsburgh metro with industrial pallet racks and warehouse storage solutions.

    Pittsburgh Pallet Racks

    Address

    2681 Sidney St.
    Suite D
    Pittsburgh, PA 15203

    Business Hours

    Monday - Friday: 8:00 AM - 6:00 PM
    Saturday: Closed
    Sunday: Closed

    Ready to Price Warehouse Relocation?

    Call (412) 866-1406 or request a quote and we will start a layout.

    (412) 866-1406
    Tap to Call